Load Center 2, King Khaled Int Airport

Client
Riyadh Airport Company (KKIA)
Location
Riyadh
Starting Date
Feb-22
Ending Date
Apr-23
Project Description
  • Engineer, Design, Supply, installation, T&C, Integration with existing control center and local training for LAN, WAN, Wireless Network & IP telephone system including cables, passive parts, UPS, active parts core and distribution switches, indoor & outdoor access point, IP Tele, routers, telepresence LAN & WAN solutions
  • Engineer, Design, Supply, installation, T&C, Integration with exist- ing control center and local training for Integrated security system (Cable, passive parts, switches, CCTV, access control)
  • Engineer, Design, Supply, installation, T&C, Integration with existing control center and local training for Public Adress System (Paging system)